Tag: Projects

UEA Electrical Wins Major 33kV Transmission Project

23 September 2014

UEA Electrical has been awarded the second stage of a major portion of capital transmission works in Western Sydney. Whilst UEA Electrical had previously been awarded the first stage of 132kV works, an intensely competitive tender process was carried out to determine the successful tenderer for the second package of works. The electrical network construction…

Read More
Tags: , ,

UEA’s Trenchless Division completes a package of work for the ‘Kooragang Industrial Water Scheme (KWIS)

9 May 2014

In August 2013, UEA’s Trenchless Division was awarded a Design and Construct package of works for Hunter Water Corporation as part of the ‘Kooragang Industrial Water Scheme (KWIS). The KWIS project provides 9ML per day of high quality recycled water to industrial users in the Kooragang Island area to substitute the use of drinking water…

Read More
Tags: , ,

UEA Trenchless Completes 200m 132 kV HDD Crossing in Sydney’s Inner Western Suburbs

2 May 2014

UEA Trenchless has completed construction of a vital crossing as a part of a major infrastructure upgrade for a Sydney power authority in inner West Sydney. The project is preventative and has been scheduled to meet the requirement of replacing key cables supplying power to Sydney’s inner western suburbs before they become unreliable. Work has…

Read More
Tags: , , ,

UEA Civil & Mining initiates two operational firsts at Sydney CBD bulk sandstone excavation project

18 April 2014

UEA Civil & Mining was contracted in early January 2014 to mobilise a 115 tonne Vermeer T1255 surface miner into the heart of the Sydney CBD for a bulk sandstone excavation project. The works involves preparation for construction of an underground car park in lower George Street and the job incorporates two unprecedented engineering feats for the…

Read More
Tags: , , , ,

UEA Electrical awarded construction of Indoor Substations

11 April 2014

UEA Electrical has been awarded the contract for three new indoor substations and associated excavation and cabling works in Western Sydney for a major commercial developer. The project will consist of: The fit-out of three indoor substation rooms Installation of switchgear in all three substations Installation of transformers in all three substations Installation and termination…

Read More
Tags: , ,