BP Australia Pipeline, Carrington



Click to Zoom

Lucas-LogoBP Australia own and operate a fuel terminal located at the corner of Industrial Drive and Elizabeth Street Carrington, near Newcastle. The terminal is used for the storage and handling of bulk quantities of diesel and petrol fuels. Due to increases in demand and mining growth in the Hunter region a need to secure supply was sought. The Newcastle infrastructure project allows fuels to be pumped directly from tankers at Port Hunter via a 2.5km steel pipeline to the refurbished BP terminal.

Construction

In order to meet the clients time requirements UEA mobilised its D100 x 120 (45 tonne) HDD drill rig and DFE 300gal/min cleaning system to undertake the pilot bore.  A steering engineer was engaged to ensure the bend radius of the pipe was not compromised. Completion of the pilot bore confirmed that ground conditions were estuarine sand with low clay content at depth. For the reaming process UEA mobilised their D300 x 500 rig and DFE 700 gal/min cleaning system. Scheduling of the reaming works were based on the day and time that pipe could be strung out across the access road in order to maintain the only heavy vehicle access to Port Hunter.

A 750mm open reamer was utilised for the pre-reaming pass in conjunction with a comprehensive mud program designed to help carry out solids and help to maintain hole stability in the sand. The bore was surprisingly stable with returns maintained for 90% of the ream, a testament to the importance of good mud in these ground conditions.

Pipe was successfully installed with pullback pressures less than 10 tonne.

For more information about this project or UEA Trenchless, please send enquiries to Steven Hopkins.