Project Portfolio

Cross connection detail

North Lismore Plateau Water Main HDD Complete

View Project
Project Name: North Lismore Plateau Stage 1 Water Main
Length: 1,589m of 280mm + 1,423m of 355mm
Product Carried: Potable water
Client: Lismore City Council
State: New South Wales
Location: Tullera Reservoir to the new development at North Lismore Plateau
Pipe: 355mm and 280mm PN16 Polyethylene
Geology: Clay with boulders
Technique: HDD, pilot boring
Bore 1 with RCP installed & Bore 2 beginning pilot boring process

Nepean Highway Bores

View Project
Project Name: 2 x gas relocation bores across the Nepean Highway
State: Victoria
Location: Highett
Pipe: DN450 & DN600 Class 4 RCP
Client: Comdain Infrastructure
Product Carried: Steel gas mains
Technique: Guided boring machine and auger boring
D100 HDD and pump set up ready to commence drilling at Kiama

Kiama Sewer Main Installation

View Project
Length: 410 metres
Product Carried: Sewer
Client: Sydney Water
Location: Kiama
State: New South Wales
Pipe: PE
Geology: Hard rock > 250 Mpa
Technique: HDD
Pipe Bursting machine pit during operation

Gosford Pipe Bursting Package

View Project
Project Name: Water Main Renewals 2015-2016 Package 1 – Pipe Bursting Design & Construct
State: New South Wales
Location: Various suburbs, Central Coast
Pipe: Polyethylene PN16 - 125mm and 180mm
Client: Gosford City Council
Length: 462 metres of 180mm & 684 metres of 125mm
Product Carried: Potable Water
Technique: Pipe bursting
Stanwell Tops steering engineer setup

Bald Hill Reserve Upgrade, Stanwell Tops – Stage 2

View Project
Client: Coordinated Landscapes
State: New South Wales
Location: Stanwell Park, Wollongong
Length: 345m
Pipe: 75mm
Product Carried: Sewer
Geology: Alluvial deposits, sand and water-charged sandstone
Technique: HDD