Scope of Works
ActewAGL regularly monitored areas at risk for sewer back log, which were then highlighted as areas that required renewal. Once a drawing was issued, UEA visited the site and assessed the impact on the residents and the community. A work method statement was developed, and sewer bypass plans were provided for areas of high flow. Residents were informed at all times of the intended works via three week and three day warning systems.
UEA utilised both hydraulic and pneumatic bursting equipment, depending on the situational requirements. Canberra ground is notoriously hard and the combination available ensured that most situations were dealt with adequately. All runs were CCTV’d prior to the work commencing, with all junctions marked on the ground. The CCTV report also provided an opportunity to assess the main for dips or potential installation issues that could be dealt with up front. All junctions were replaced with a combination of PVC and polyethylene back to the resident boundary or inspection cover. Upon completion, the new main was CCTV’d and all areas were restored to their original state.