Press Gallery

Horizontal Directional Drilling drives fuel line for BP – The Australian Pipeliner

1 July 2009

UEA was contracted by AJ Lucas on behalf of BP Australia to install 345 metres of 16inch steel pipeline.

Download

Tallawarra gas pipeline project – Trenchless Australasia

1 March 2008

UEA was engaged by Abigroup and Gold Coast Water to undertake the directional boring project under the Coomera River.

Download

Horizontal Directional Drilling helps expand water supply in NSW Trenchless Australasia

1 March 2008

UEA uses a Vermeer D300 x 500 horizontal directional drill to power through rock formations at Shannons Creek Storage Facility.

Download

UEA completes boring project on the Gold Coast – The Australian Pipeliner

1 October 2007

UEA was engaged by Abigroup and Gold Coast Water to undertake the directional boring project under the Coomera River.

Download

Horizontal Directional Drilling reaches new levels of accuracy for on grade sewer projects – Trenchless Australasia

1 August 2006

UEA was contracted by Maunsell Australia to construct 1.2km of sewer rising main in an environmentally sensitive area within the Parliamentary triangle of Canberra.

Download