Press Gallery

Tunnel success an Australian first – Central Coast Express Advocate

8 July 2011

Staff at Wyong and Gosford Councils are celebrating with the successful completion of an Australian first – horizontal directional drilling under the Wyong River as part of the Mardi-Mangrove Link project.

Download

Major breakthrough in Mardi-Mangrove link – Central Coast Express Advocate

1 July 2011

UEA has successfully installed a 260m section of fused pipe under the Wyong River using horizontal directional drilling. It is the first time a pipe this size, length and pressure rating has been installed in Australia using horizontal directional drilling technology.

Download

Delivering cleaner waterways for Sydney – Trenchless Australasia

1 October 2010

UEA successfully completes a 1,403 metre horizontal directional drill of 500mm HDPE from Brightmore Reserve in Cremorne for the SewerFix Wet Weather Alliance

Download

UEA gravitates to success – The Australian Pipeline

1 October 2009

Hunter Water Corporation contracted UEA to design and construct approximately 510 metres of gravity sewer mains.

Download

Directional Boring down Park Avenue – Trenchless Australasia

1 September 2009

Sydney Water SewerFix Alliance engage UEA to undertake the Park Avenue bore based on the proposed work method statement and track record for completing difficult horizontal directional drilling projects.

Download