Major breakthrough in Mardi-Mangrove link – Central Coast Express Advocate

Posted 1 July 2011

UEA has successfully installed a 260m section of fused pipe under the Wyong River using horizontal directional drilling. It is the first time a pipe this size, length and pressure rating has been installed in Australia using horizontal directional drilling technology.