UEA News Blog
Pipe Bursting an Eco-Friendly Solution in Dubbo
Pipe bursting was required to complete this environmentally sensitive renewal project as large, established trees were situated above the existing main and could not be removed. In addition, existing utilities were situated along either side of the existing water main, leaving the existing 100mm water main as the only possible location for the new 125mm PE pipe. Read more.
UEA Expands Pipe Bursting Capabilities
UEA Trenchless has expanded its pipe bursting capabilities with the purchase of two new pipe bursting machines – a Grundoburst 800G and a Vermeer/Hammerhead 50T Hydraulic burster with power pack. Read more.
Pipe Bursting Underway in South East Queensland
UEA has been contracted to replace 1100m of 150mm asbestos concrete pipe and PVC sewer rising main with 250mm PE pipe using pipe bursting technology. Read more.
UEA Wins Pipe Bursting Design and Construct Contract
UEA Trenchless will renew 1100m of 150mm AC/PVC sewer rising main with 250mm PE PN16 using pipe bursting methods in South East Queensland. Read more.
Pipe Bursting: The true long-term renovation of mains
What is Pipe Bursting? UEA specialises in two methods of pipe bursting, Pneumatic and Hydraulic, both of which can be used to replace existing water and sewer mains, the only form of long-term renovation. Read more.
