UEA News Blog
UEA Trenchless a proud sponsor of No-Dig Down Under 2013.
UEA Trenchless is a proud sponsor of International No-Dig Down Under 2013. UEA Trenchless is proud to be a silver sponsor of No-Dig Down Under 2013 which will be take place from 1 – 4 September at the Sydney Convention and Exhibition Centre. Read more.
UEA Purchase D60 x 90 Directional Drilling Rig
With a footprint not much bigger than machines with half its power the Vermeer D60 x 90 compliments UEA's growing fleet of directional drilling rigs covering the 30,000lb to 300,000lb range. Read more.
UEA Further Develop Flowable Grouts For Trenchless Installations
UEA have continued to develop flowable grouts to suit high specification trenchless installations. The latest grout design allows small annular spaces to be filled over long distances on very flat grades. Read more.
Tomago – Raymond Terrace Sewer Rising Main
UEA Trenchless recently completed a 600mm utility tunneling project for Bolte Civil through environmentally sensitive wetlands on the Tomago to Raymond Terrace sewer rising main. The tunneling project consisted of three road crossings, including a 110m crossing of the Pacific Highway and adjacent wetlands. Read more.
UEA is proud to be a silver sponsor of Trenchless Live 2012
Trenchless Live 2012, Australasia's premier Trenchless Technology event, will be taking place at the Melbourne Showgrounds from October 23-24 and will feature a hands-on live exhibition and demonstration of trenchless equipment, alongside a case study-based technical program. Read more.
