Press Gallery

Directional Boring down Park Avenue – Trenchless Australasia

1 September 2009

Sydney Water SewerFix Alliance engage UEA to undertake the Park Avenue bore based on the proposed work method statement and track record for completing difficult horizontal directional drilling projects.
Download (475 KB)

Horizontal Directional Drilling drives fuel line for BP – The Australian Pipeliner

1 July 2009

UEA was contracted by AJ Lucas on behalf of BP Australia to install 345 metres of 16inch steel pipeline.
Download (467 KB)

Horizontal Directional Drilling helps expand water supply in NSW – Trenchless Australasia

1 March 2008

UEA uses a Vermeer D300 x 500 horizontal directional drill to power through rock formations at Shannons Creek Storage Facility.
Download (244 KB)

Tallawarra gas pipeline project – Trenchless Australasia

1 March 2008

UEA utilise a Vermeer D300 x 500 horizontal directional drill to bore and install 763 metres of 272mm steel pipe in rock rated up to 120Mpa.
Download (409 KB)

UEA completes directional boring project on the Gold Coast – The Australian Pipeliner

1 October 2007

UEA was engaged by Abigroup and Gold Coast Water to undertake the directional boring project under the Coomera River.
Download (418 KB)