Press Gallery
HDD record set on Mardi-Mangrove Link Project
14 October 2011
UEA recently completed the first installation of a 1,200mm diameter SDR11 PN16 HDPE water main in Australia using a horizontal directional drill.
Download (2.54 MB)
The rock eater just got bigger - Contractor Magazine
11 October 2011
The first production Vermeer T1655 Terrain Leveler in the world recently commenced work in Western Australia. In terms of size this was not a step up from the previous model – it was a giant leap.
Download (396 KB)
UEA Pioneers of surface mining - Contractor Magazine
9 September 2011
UEA featured in Australia's Infrastructure and Civil Construction Magazine- Contractor - September 2011
Download (296 KB)
Tunnel success an Australian first - Central Coast Express Advocate
8 July 2011
Staff at Wyong and Gosford Councils are celebrating with the successful completion of an Australian first - horizontal directional drilling under the Wyong River as part of the Mardi-Mangrove Link project.
Download (385 KB)
Major breakthrough in Mardi-Mangrove link - Central Coast Express Advocate
1 July 2011
UEA has successfully installed a 260m section of fused pipe under the Wyong River using horizontal directional drilling. It is the first time a pipe this size, length and pressure rating has been installed in Australia using horizontal directional drilling technology.
Download (435 KB)
