Electrical Projects

Maitland to Whittingham Third Track Project - Overhead Asset Relocation

View Project

Project Name: Maitland to Whittingham Third Track Project - Overhead Asset Relocation
Client: Hunter 8 Alliance on behalf of Australian Rail Track Corporation
State: New South Wales
Energy Provider: Ausgrid
Substation: 200kVA pole type
Works: Overhead
Cable: 19/3.75 AAC (11kV); 7/4.5 AAC (11kV); LV 4x95 ABC; 3/2.50 – 4/2.50 ACSR (11kV)

Jedda Road, Prestons

View Project

Project Name: Jedda Road, Prestons
Client: Wishton Construction Pty Ltd
State: New South Wales
Energy Provider: Endeavour Energy
Design: UEA Electrical
Substation: 11kV- 415V Padmount Substation 500kVA
Works: Underground
Conduit Length: 66m
Cable: 140m, 11kv 240mm2 Al 3C XLPE (ACES Supplied)

Fujitsu Australia Chamber Substation

View Project

Project Name: Fujitsu Australia Chamber Substation
Client: Fujitsu Australia
State: New South Wales
Energy Provider: Ausgrid
Design: UEA Electrical
Substation: Ausgrid Three 1500kVA Transformer Suburban Chamber Substation
Works: Underground
Conduit Length: 1600m
Cable: 500sqmm AL XLPE (11kV); 300sqmm CU Triplex EPR (11kV); LV XLPE

Anglican Retirement Villages

View Project

Project Name: Anglican Retirement Villages
Client: Stephan Edwards Constructions
State: New South Wales
Energy Provider: Endeavour Energy
Design: Sustainable Energy Designs
Substation: 11kV- 415V Padmount Substation 500kVA
Works: Underground and Overhead
Conduit Length: 100m
Cable: 200m, 11kv 240mm2 Al 3C XLPE (ACES Supplied)

Pendle Hill Power Distribution Project

View Project

Project Name: Pendle Hill Power Distribution Project
Client: Pendle Ham and Bacon Curers
State: New South Wales
Energy Provider: Endeavour Energy
Design: UEA Electrical
Substation: 11kV- 415V Padmount Substation 1000kVA
Works: Underground
Conduit Length: 16m
Cable: 40m, 11kv 240mm2 Al 3C XLPE (ACES Supplied)